Off-Line Cable PD Testing Using VLF
LIVE HV can now provide Off-Line Partial Discharge testing for cables using a VLF test set to energise the cable. Already leading the way with On-Line
LIVE HV can now provide Off-Line Partial Discharge testing for cables using a VLF test set to energise the cable. Already leading the way with On-Line
The Issue Ever wondered when you should perform HV testing and PD monitoring? LIVE HV can assist in developing a management plan for all HV asset typ
The Issue Lockdowns and border closures can make it difficult to get contractors to your site to assess or investigate issues as they arise. However,
Situation An offline Partial Discharge test is becoming standard practise during routine high voltage commissioning of switchgear. And for good reaso
LIVE HV provides online Partial Discharge (PD) monitoring for rotating machines to accurately determine the asset’s insulation condition. Measurement
Analysing the condition of over 2000 cables in recent years has resulted in an accumulation of data from which compelling trends can be extracted. On
Live HV are pleased to welcome Jaspar Matters to the team as a test engineer. Responsible for testing and analysing a range of high voltage assets, Ja
Rapid Earth Fault Current Limiter (REFCL) technology is being rolled out across the State as part of the Victorian Governments Powerline Bushfire Saf
Live HV is excited to announce the acquisition of Kate Westbrook as a testing and diagnostic technician. Kate is a qualified A Grade electrician with
Following a cable fault, standard procedure is detecting the location of the fault, traditionally using methods such as Time Domain Reflectometry (TDR